(956) 531-9910
Get a free estimate Call (956) 531-9910

Bathroom remodeling in Dallas

Steam showers, soaking tubs, marble and onyx, finished with a grand hotel's restraint.

A short form: 5 steps, about 2 minutes.

Now serving Dallas and surrounding areas.

What we build
  • Walk-in showers
  • Stone and tile
  • Vanities
  • Fixtures
  • Heated floors

Stone, light and quiet detail

Now serving Dallas. Spa baths finished in onyx and marble chosen at our Dallas showroom, with steam showers, soaking tubs and heated floors, designed in 3D and built by our own crews.

What clients have written about their homes

More client words

We were so happy with his team’s reliability after the first project (pool), we have returned for many other projects.

Google review

I recently got a 60ftx6ft cinderblock fence done and it came out amazing with the stucco. ... I asked for the stucco to match my existing home and it came out perfect.

Google review

Dallas · Bathroom remodeling

We finish what we start.

Our family has been building across Texas, and earning the trust of the people we build for, since 1977. You pay as the work is built, never for a hole in the ground. Our own team builds it with materials we’d put in our own homes. You have one number to call, from the first sketch to the first swim.

  • Building since 1977
  • Pay as it’s built
  • Our own team
  • One number to call

Finished work

  • Marble waterfall island, arched window
    Marble waterfall island, arched window
  • Stone island and walnut cabinetry
    Stone island and walnut cabinetry
  • Dark stone infinity pool and timber pergola
    Dark stone infinity pool and timber pergola
  • Adobe courtyard pool and loggia
    Adobe courtyard pool and loggia

A short form: 5 steps, about 2 minutes.

Dallas questions about bathroom remodeling

How much does a bathroom remodel cost in Dallas?

It depends on size, layout and finishes. Your 3D design comes with an itemized proposal, every line visible, so the number you approve is the number you pay unless you change the scope.

How long does a bathroom remodel take?

Your proposal includes a clear schedule before work begins, and one construction manager holds it from start to finish.

Can I remodel one room at a time?

Absolutely. Many clients begin with a kitchen or primary bath and return for the next phase. Each phase is planned so the whole home comes together.

How do payments work?

Simply: you pay as it's built. A deposit reserves your design and start date, then each payment matches a completed stage. Lien releases on request. Financing and payment plans are discussed at your consultation.

Who does the work?

Our own construction managers and crews. One team, one point of contact, state-licensed trades for electrical and plumbing, and insurance on every project.

Begin with how you live in it.

Tell us what you have in mind. We start from your answers, so you only adjust.

A short form: 5 steps, about 2 minutes.

Call (956) 531-9910 Get a free estimate